NexGold Intersects 61.22 g/t Gold over 12.0 Metres and 5.85 g/t Gold over 13.0 Metres During Infill Drill Program at the Goldboro Gold Project in Nova Scotia
TORONTO, June 25, 2026 (GLOBE NEWSWIRE) -- NexGold Mining Corp. (TSXV: NEXG; OTCQX: NXGCF) (“NexGold” or the “Company”) is pleased to provide initial results from its detailed Reverse Circulation infill drill program (“RC Infill Drill Program”) at the Company’s Goldboro Gold Project in Nova Scotia (“Goldboro Project”). The RC Infill Drill Program, which comprises up to 30,000 metres in 600 holes, is focused on the Goldboro Deposit and is designed to infill specific areas of the Goldboro Minera
TORONTO, June 25, 2026 (GLOBE NEWSWIRE) -- NexGold Mining Corp. (TSXV: NEXG; OTCQX: NXGCF) (“NexGold” or the “Company”) is pleased to provide initial results from its detailed Reverse Circulation infill drill program (“RC Infill Drill Program”) at the Company’s Goldboro Gold Project in Nova Scotia (“Goldboro Project”). The RC Infill Drill Program, which comprises up to 30,000 metres in 600 holes, is focused on the Goldboro Deposit and is designed to infill specific areas of the Goldboro Mineral Resource at a nominal drill spacing of 12.5 metres and down to depths of 50 metres (Figures 1 and 2).
Summary aggregated from GlobeNewswire's public RSS feed. The full reporting belongs to GlobeNewswire — please read it on their site.