DalsnaFinance

Blossom Gold Reports Initial, Open Pit Expansion and Infill Drill Results from the Rosebud Open-Pit, Heap-Leach Project

Markets GlobeNewswire By GlobeNewswire 30 Jun 2026 11:00 1 min read
Blossom Gold Reports Initial, Open Pit Expansion and Infill Drill Results from the Rosebud Open-Pit, Heap-Leach Project

TORONTO, June 30, 2026 (GLOBE NEWSWIRE) -- Blossom Gold Inc. (formerly, 1290448 B.C. Ltd.) (“Blossom” or the “Company”) (TSX: BGAU) is pleased to announce initial drill results from its 2026 exploration drilling program at the Rosebud Project, located in Pershing County, Nevada. Notable intervals include: BG26-002 - 41.2m @ 0.385gAu/t, from 19.8m; BG26-005 - 18.3m @ 0.794gAu/t, from 126.5m; BG26-007 - 81.5m @ 0.385gAu/t, from 27.1m; BG26-008 - 24.4m @ 0.549gAu/t, from 146.3m; BG26-010 - 18.3m

TORONTO, June 30, 2026 (GLOBE NEWSWIRE) -- Blossom Gold Inc. (formerly, 1290448 B.C. Ltd.) (“Blossom” or the “Company”) (TSX: BGAU) is pleased to announce initial drill results from its 2026 exploration drilling program at the Rosebud Project, located in Pershing County, Nevada. Notable intervals include: BG26-002 - 41.2m @ 0.385gAu/t, from 19.8m; BG26-005 - 18.3m @ 0.794gAu/t, from 126.5m; BG26-007 - 81.5m @ 0.385gAu/t, from 27.1m; BG26-008 - 24.4m @ 0.549gAu/t, from 146.3m; BG26-010 - 18.3m @ 0.509gAu/t, from 24.4m; BG26-011 - 13.8m @ 0.685gAu/t, from 96.8m; BG26-016 - 99.5m @ 0.392gAu/t, from 105.8m, including 42.8m @ 0.557gAu/t, from 148.6m; and BG26-021 - 42.7m @ 0.440gAu/t, from 143.7m, including 26.2m @ 0.915gAu/t, from 160.2m.

Read the full story on GlobeNewswire → Opens the original article on www.globenewswire.com

Summary aggregated from GlobeNewswire's public RSS feed. The full reporting belongs to GlobeNewswire — please read it on their site.